sales01@lockeysafety.com +86-133-96996593
Open Start Circuit Lockout

Open Start Circuit Lockout

Part No.:CBL02-3 Moulded Case Circuit Breaker Lockout a)Made from engineering plastic strengthened nylon PA. b)Lock out different types of circuit breakers.

Description

Part No.:CBL02-3

Moulded Case Circuit Breaker Lockout

a) Made from engineering plastic strengthened nylon PA.

b) Lock out different types of circuit breakers.

Part No.

Description

CBL02-1

Size: 55mm(W)×26mm(H)×19mm(D), max clamping 10mm,

need a small screw driver to install

CBL02-2

Size: 55mm(W)×26mm(H)×19mm(D), max clamping 10mm,

without installing tools needed.

CBL02-3

Size: 55mm(W)×33mm(H)×19mm(D), max clamping 10mm,

without installing tools needed.

2

Basic requirements for energy isolation management regulations

1. Dependency units shall prepare process unit treatment schemes and process system energy isolation schemes, which involve system public works, cross-workshop boundary areas and overall isolation of devices or units, organize relevant departments and workshops of the company to approve, and the others shall be approved by the Dependency units themselves.

2. In principle, trust the blind, not the valve, for energy isolation.

3. The isolation point with blind plate isolation does not need Lockout tagout, and the blind plate should be hung. All isolation valves shall be locked and labeled before the blind plate pumping and plugging operation. For the blind plates requiring length plugging, such as stoppage and opening, the isolation valve can be unlocked after the end of the plugging operation of the blind plate. For the blind plates requiring short-term plugging during temporary construction, the isolation valve can be unlocked after the end of the plugging operation of the temporary construction and the plugging operation of the blind plate.

4. Safety locks must be matched with "Danger! Do not operate with the "label". When the isolation point does not meet the locking conditions, the label can be hung without locking with the consent of the operator and the person in charge of production of the dependent unit and with the signature on the label.

Steps for energy isolation

Locking of a single isolation point:

The project leader of the territorial unit (or his authorized person, such as guardian) and the operator of the operating unit secure the isolation point with a personal lock.

The locking of multiple isolation points is implemented in the following order:

1. The project leader of the territorial unit locks and hangs labels on all isolation points with collective cables.

2. Put the key of the collective lock into the lock box, and the key number should correspond to the safety lock on site.

3. The project leader of the territorial unit and the personnel at each operation point of the operation unit shall lock the lock box with personal locks.

4. The person in charge of the site of the operation unit shall ensure that the staff at each operation point shall lock the collective lock box.

5. The issuer of the work permit of the local unit must check and confirm the locking point in person before issuing the relevant work permit.

6. The work approval person of the territorial unit must verify that the above procedures have been effectively observed and implemented before issuing the work permit.

Specially designed according to your special requirements, our open start circuit lockout made by one of the professional manufacturers and suppliers of lockout products in China - LOCKEY. You are welcomed to wholesale customized open start circuit lockout made in China at cheap price with our factory, and we also offer the free sample.
Hot Tags: open start circuit lockout, manufacturers, suppliers, factory, customized, wholesale, price

Send Inquiry