sales01@lockeysafety.com +86-133-96996593
4 Steps To Lockout Tagout

4 Steps To Lockout Tagout

Nov 29, 2018

Lockout tagout

1. Lockout: the electrical professional shall add a safety lock and lock to the switch cabinet (box) isolation point of the power failure equipment and ensure the power supply is safely disconnected; 

2.tagout: hang "no closing, working" warning sign at the locked power supply switch;

3. After safety locking, the padlock key shall be kept by the workshop head (section head), inspection and maintenance head and electrical professionals; 

4. After locking, the workshop head (section head), maintenance personnel and electrical professionals should make lock records in the lock record book.158(1)