Part No.: ALP38, ALP76
Aluminum Safety Padlock
Description
a) Aluminum body and shackle is steel and have been triple-coated hardened chrome plated.
b) When you open the lock, the shackle will pop up automatically.
c) Shackle Length: 38mm and 76mm.
d) Colors for choice: red, yellow, blue, orange, green, purple, black, sliver.
e) Other shackle lengths can be customized.
Part No. | Specification | Description |
ALP38 | Inside shackle:38mm; shackle diameter:6mm | Support key system Key Alike, Key Differ, Master&Alike/Differ Key, Grand Master Key |
ALP76 | Inside shackle:76mm; shackle diameter:6mm |
Different Key Systems for your choice:
Project process and content
Project preparation stage
1. Communicate and count the workload on site and confirm the sample equipment.
2. Set up the team, select the responsible person and relevant authorized personnel.
3. Set up consulting project team, basic training, and establish corporate culture loto system.
Project execution stage
1. Risk assessment of relevant operational activities.
2. Formulation of energy locking control scheme, identification and calibration of dangerous energy points, and energy layout diagram.
3. Prepare operation instructions for energy locking.
4. Special training, authorized training and assessment.
Project inspection phase
1. Operation inspection of authorized personnel.
2. Check operation instruction and operation procedure.
3. Check the alternative method of locking and listing.
4. Management situation of spot check lock.
Project evaluation stage
1. Design guidance for auditing standards and various process checklists.
2. Review the final implementation of the project with party a's customers.
3. Summarize the implementation and propose Suggestions for improvement.
Potential risks and uncertainties
Considering the insufficient promotion of energy isolation and the weak foundation of energy isolation, it takes time to get familiar with the operating run-in system.
General idea of energy isolation promotion:
Confirm pilot unit
Conduct related work on samples
It is promoted by pilot units in stages
Full implementation of energy isolation
Verify updated and complete specifications